Reports until 16:01, Friday 27 October 2023
H1 General
camilla.compton@LIGO.ORG - posted 16:01, Friday 27 October 2023 (73780)
Ops Day Shift End

TITLE: 10/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: IFO has been locked 28h30. Just finished up a commissioning period from 20:00 to 22:55UTC
LOG:

During commissioning:

This morning we had to touch FC2 alignment when the FC unlocked 73770, but since then Naoki has adjusted the FC2 beam centering 73777 so we except this won't be an issue in the future.

Start Time System Name Location Lazer_Haz Task Time End
15:21 FAC Randy EY N Lab room 17:16
17:40 FAC Randy MY N MY 19:40
18:02 FAC Kim MX N Technical Cleaning 18:33
18:59 FAC Kim H2 N Technical Cleaning 19:10
20:02 ISC Camilla CR N Mich FF measured 20:21
20:21 COMM Vlad CR N PI injections 15kHz 22:21
20:22 CAL Louis CR N Calib sweeps for DARM boost 23:00
21:00 SQZ Naoki CR N Retune and FC2 centering 23:00
21:03 PCAL Tony PCAL lab Local PCAL ?????
21:16 AOS Jason, Austin Optics Lab N Oplev work 22:39