Reports until 16:07, Sunday 29 October 2023
H1 General (CDS, SUS)
ryan.crouch@LIGO.ORG - posted 16:07, Sunday 29 October 2023 - last comment - 21:50, Sunday 29 October 2023(73824)
OPS Sunday eve shift start

TITLE: 10/29 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 160Mpc
OUTGOING OPERATOR: Camilla (DAY)
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 3mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.20 μm/s
QUICK SUMMARY:

Comments related to this report
keith.thorne@LIGO.ORG - 21:50, Sunday 29 October 2023 (73827)
The action of loading new filter modules likely caused an (expected) interruption in the output of the real-time model on h1lsc0 - this is the cause of the transient DAQ checksum (CRC) error