TITLE: 10/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
LOG: Currently finishing some SQZ commissioning while LLO is down. Today we have backed out the CARM gain change 73844.
Had a lockloss at 19:42UTC 73843. Some EY temperature excursions today 73835 73841 that are now back to nominal. ITMY mode 5/8 violins have needed different damping settings 73845.
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:01 | FAC | Eric | EY | N | Check on AC units, Not in VEA | 16:15 |
15:05 | FAC | Karen | Optics Lab, Vac Prep | N | Technical Cleaning | 15:33 |
15:36 | FAC | Karen | MY | N | Technical Cleaning | 17:14 |
15:37 | FAC | Tyler | EY | N | Temperature AC Investigations | 16:09 |
16:13 | FAC | Tyler, Eric | EY | n | Temp investigation/fix 73841 | 17:35 |
16:32 | FAC | Richard | EY | N | Temp AC investigations | 17:07 |
16:44 | FAC | Randy | EX | N | Check on lift | 17:40 |
19:52 | FAC | Randy | EY | N | Moving parts/materials | 22:52 |
21:34 | VAC | Gerardo. Jordan | FCE (door nr LVEA) | N | Moving turbo pumps from staging to FCE (door closest to LVEA) | 22:11 |
22:50 | VAC | Janos, Jordan | VPW | N | Drop off parts | ????? |