TITLE: 11/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 160Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Locked for 23.5 hours. Violin modes seem to have leveled out and are no longer damping at the rate they were, but overall are much lower. VEA temperature is back to stable after Robert's sitewide HVAC shutdown.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:08 | FAC | Karen | Opt Lab | n | Tech clean | 15:11 |
| 15:22 | FAC | Tyler, Robert | EX | n | Change air handler fan and speeds | 15:23 |
| 17:16 | FAC | Tyler, Eric | EX | n | Looking at supply fan | 17:17 |
| 17:22 | PCAL | Tony | OptLab | local | PCAL sphere measurement in lab | 19:22 |
| 18:05 | FAC/PEM | Robert | site | Brief HVAC shutdowns | 20:05 | |
| 21:20 | VAC | Jordan | MY | n | Drop off parts | 22:08 |
| 21:55 | VAC | Gerardo | FCTE | n | Looking at vacuum | 22:39 |