TITLE: 11/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
- EX saturation @ 16:24
- 18:21 - inc 5.6 EQ from Nepal
- 18:52 - inc 5.1 EQ from Russia
- Lockloss @ 20:18, caused by MICH FF test
- Relocking:
- Lockloss @ 22:08, due to PUM crossover measurement
- Relocking:
- 22:43 - PSL DM 102 alert 300 nm, counts spiked to 310
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:58 | FAC | Karen | Optics Lab/VAC Prep | N | Tech clean | 16:17 |
| 16:00 | FAC | Tyler/Eric | CER | N | Rack work | 19:16 |
| 16:36 | PEM | Robert | EX | N | Change frequency of pump | 18:06 |
| 17:36 | VAC | Jordan/Travis | MY | N | Drop off parts | 18:02 |
| 18:17 | CDS | Erik/Fil | Roof | N | Check antenna (staying on platform) | 18:27 |
| 20:10 | ISC | Naoki | CR | N | MICH FF tuning | 20:21 |
| 20:11 | PEM | Robert | EX/Y/CER | N | Grab parts/set up | 21:09 |
| 20:28 | VAC | Travis/Jordan | LVEA | N | Roll in a rack | 20:49 |
| 20:28 | EPO | Jenne + 5 | LVEA | N | Quick walkaround | 20:49 |
| 21:29 | VAC | Travis | MY | N | Grab parts | 21:49 |