TITLE: 11/04 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Austin
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 7mph Gusts, 4mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.28 μm/s
QUICK SUMMARY: H1 has been locked for over 20 hours. We've just started opportunistic PEM commissioning while L1 is down (no more than 30 minutes).
H1 is back to observing as of 23:32 UTC.