Reports until 16:05, Monday 06 November 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:05, Monday 06 November 2023 (74029)
Ops Day Shift Summary

TITLE: 11/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: A lock loss at 2252UTC ended a 16.5 hour lock. During the day there was HVAC testing from Robert (alog74026). We just got back to low noise.
LOG:          

Start Time System Name Location Lazer_Haz Task Time End
16:19 FAC Karen OpticsLab n Tech clean 17:23
17:24 FAC Karen MY n Tech clean 18:24
17:49 FAC Kim MX n Tech clean 18:27
17:49 FAC Randy MX,MY n Parts hunt 19:49
20:00 PEM/FAC Robert EX n Turning off HVAC 22:00
22:50 FAC Eric EX n Changing supply fan configuration 23:50