TITLE: 11/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: A lock loss at 2252UTC ended a 16.5 hour lock. During the day there was HVAC testing from Robert (alog74026). We just got back to low noise.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:19 | FAC | Karen | OpticsLab | n | Tech clean | 17:23 |
| 17:24 | FAC | Karen | MY | n | Tech clean | 18:24 |
| 17:49 | FAC | Kim | MX | n | Tech clean | 18:27 |
| 17:49 | FAC | Randy | MX,MY | n | Parts hunt | 19:49 |
| 20:00 | PEM/FAC | Robert | EX | n | Turning off HVAC | 22:00 |
| 22:50 | FAC | Eric | EX | n | Changing supply fan configuration | 23:50 |