Reports until 16:24, Tuesday 07 November 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:24, Tuesday 07 November 2023 (74079)
Ops Day Shift Summary

TITLE: 11/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Maintenance day with higher winds. There have been a few changes that should help lock acquisition - COMM beatnote improvement and ALS_DIFF IR finding. We are back at observing, though our range is a bit lower than it has been recently.
LOG:

0001 Observing                

Start Time System Name Location Lazer_Haz Task Time End
16:05 PCAL Tony PCAL Lab y(local) Getting stuff for tests 16:15
16:06 PCAL Tony, Rick EY YES PCAL measurements 19:54
16:12 FAC Mitch EY/EX YES(EY) FAMIS Tasks 17:22
16:12 FAC Karen EY YES Tech clean 17:28
16:14 IMC Jason CR n RefCav Adjustment 16:23
16:17 TCS Camilla CR n CO2 Laser Power adjustment (started 16:15) 17:33
16:18 FAC Chris, Eric LVEA n FAMIS Tasks 16:40
16:26 FAC Kim EX n Tech clean (done at 17:20) 18:11
16:39 EE Fil CER n Slow Controls Chassis 5 installation 17:12
16:40 FAC Chris, Eric FCES n FAMIS tasks 16:51
16:50 PEM Robert LVEA n Moving stuff/PEM Injections 20:13
16:51 S&R Christina Wood shop n Throwing away stuff 17:44
16:52 FAC Eric, Chris EY,EX YES(EY) FAMIS tasks 17:27
16:57 SEI Jim CR n Troubleshooting HAM8 17:12
17:05 CDS Erik EY n Replacing HWS server 19:51
17:11 SAF Safety walkthough LVEA, FCES n Safety walkaround 18:41
17:13 SEI Jim, Fil FCES n HAM8 GS13 18:12
17:20 SQZ Daniel, Fernando CR n Beckoff (started 8:30ish) 17:38
17:21 FAC Randy EY YES Moving cleanrooms 19:52
17:26 FAC Cindi FCES n Tech clean 18:54
17:27 ISC Jason, Ryan C LVEA n Moving equipment 18:13
17:35 Tour Camilla, Martha LVEA, FCES n Tour 18:09
17:41 ISC Daniel, Fernando CER n Removing Beckoff chassis 18:10
17:41 FAC Mitch LVEA n Moving equipment 19:30
17:51 FAC Chris, Pest Control LVEA n Check traps 19:49
18:10 Tour Camilla, Martha Roof n Admiring the view 18:20
18:12 FAC Karen LVEA n Tech clean 19:31
18:12 FAC Kim LVEA, HighBay n Tech clean 19:31
18:13 EE Fil EX n Getting equipment 19:11
18:20 GRD TJ CR n Testing Guardian on ITMY 19:32
18:21 Tour Camilla, Martha EY n Tour of outside of EY 19:12
18:55 FAC Cindi FCET n Tech clean 19:00
19:00 FAC Cindi OSB Receiving n Getting cardboard 19:32
19:02 SAF Safety walkthrough Mid/End stations YES(EY) Safety walkaround 19:53
19:09 ISC TJ, Sheila LVEA YES(local) Adjusting COMM beatnote 19:40
19:12 EE Fil HAM6 n Getting cable lengths 19:50
19:15 SEI Jim HAM7 n Looking at HAM7 19:55
19:29 TCS Camilla LVEA n Looking through TCS cabinets 19:50
19:56 SEI Jim CR n Testing SC recovery 20:20
21:36 CDS Jonathan, Erik MSR n Removing unused switch 21:37
21:52 PCAL Tony PCAL lab local PCAl meas wrapup 01:52