Immediately after commissioning work, jumped into running calibration measurements (broadband [~5min] + simullines [~25min]) from roughly 0000-0036utc.
- Following instructions (link)
- 0000 ISC LOCK to NLN_CAL_MEAS
- 0006 - 0011 Broadband measurement run
- Measurement at: /ligo/groups/cal/H1/measurements/PCALY2DARM_BB/PCALY2DARM_BB_20231109T000527Z.xml
- 0013 - 0035 Simullines measurement
- gps start time: GPS: 1383524041.078507 (perhaps a second or two before this time)
- gps end time: GPS: 1383525357.891477
- Files writtten to (5) subfolders here: /ligo/groups/cal/H1/measurements