Reports until 16:09, Saturday 11 November 2023
H1 General (SEI)
anthony.sanchez@LIGO.ORG - posted 16:09, Saturday 11 November 2023 (74165)
Saturday Day Shift End

 

TITLE: 11/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Austin
SHIFT SUMMARY:
 

So far so good, the wind speed has picked up

The PSL Dust mon just hit 300 again on H1:PEM-CS_DUST_PSL101_300NM_PCF

18:13 UTC Dropped out of Observing due to SQZ_MANAGER changed
2023-11-11_08:11:39.133044Z SQZ_MANAGER REQUEST: SQZ_READY_IFO
2023-11-11_08:11:39.133044Z SQZ_MANAGER calculating path: SQZ_READY_IFO->SQZ_READY_IFO
It seems like the SQZ Manager had some sort of issue with the FC-IR unlocked!
Tagging SQZ

18:15 UTC back to Observing
4 tours rolled through the control room, and out to the overpass.
PSL Dum Mon has been alarming all

 

LOG:
                                                                                                             

Start Time System Name Location Lazer_Haz Task Time End
19:38 Tour Corey Janos Mike Cassidy + Tours Control room N Standard tours goin to the overpass. 22:38