TITLE: 11/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Austin
SHIFT SUMMARY:
So far so good, the wind speed has picked up
The PSL Dust mon just hit 300 again on H1:PEM-CS_DUST_PSL101_300NM_PCF
18:13 UTC Dropped out of Observing due to SQZ_MANAGER changed
2023-11-11_08:11:39.133044Z SQZ_MANAGER REQUEST: SQZ_READY_IFO
2023-11-11_08:11:39.133044Z SQZ_MANAGER calculating path: SQZ_READY_IFO->SQZ_READY_IFO
It seems like the SQZ Manager had some sort of issue with the FC-IR unlocked!
Tagging SQZ
18:15 UTC back to Observing
4 tours rolled through the control room, and out to the overpass.
PSL Dum Mon has been alarming all
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:38 | Tour | Corey Janos Mike Cassidy + Tours | Control room | N | Standard tours goin to the overpass. | 22:38 |