Reports until 08:04, Sunday 19 November 2023
H1 General
oli.patane@LIGO.ORG - posted 08:04, Sunday 19 November 2023 - last comment - 09:05, Sunday 19 November 2023(74285)
Ops DAY Shift Start

TITLE: 11/19 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Austin
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 23mph Gusts, 14mph 5min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.56 μm/s
QUICK SUMMARY:

Detector is relocking and just got to ACQUIRE_PRMI. Wind is increasingly jumping up past 30mph, and secondary microseism is also way up due to a large storm off the coast.

Comments related to this report
oli.patane@LIGO.ORG - 08:11, Sunday 19 November 2023 (74286)

16:09 I started an Initial Alignment because we started getting stuck in the ACQUIRE_PRMI -> ACQUIRE_DRMI_1F -> ACQUIRE_PRMI cycle again

oli.patane@LIGO.ORG - 09:05, Sunday 19 November 2023 (74287)

16:55 We kept having locklosses, even from as far up as CARM_OFFSET_REDUCTION, possibly due to high winds (lots of gusts) and high microseism. Will try initial alignment and relocking in ~15 mins.

Images attached to this comment