Went through all the Feed Thrus on these chambers and added strain relief. This consists of the rod (bolt, all-thread) & zip tie. I also fussed with cable routing some to get cables off the HEPI Crossbeams (Floating.) I had to power down the HAM2 CPS racks for a time. Couple photo attached if you care to see what I'm talking about.
I care - very nice.