Reports until 16:08, Tuesday 21 November 2023
H1 General
ryan.crouch@LIGO.ORG - posted 16:08, Tuesday 21 November 2023 - last comment - 16:12, Tuesday 21 November 2023(74330)
OPS Tuesday day shift summary

TITLE: 11/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Busy maintenance day; SQZ cabling (PMC, OMC), PSL Refcav alignment, ISS 2nd loop, VAC turbopump checks, valves and gauges added to FCT, ALS laser adjustments at EX, HWS work also at EX, cleanroom building at EY, and camera fibers reseeded in the MSR. Back to NLN at 06:00UTC! Lockloss 12 seconds later :(

HAM7 ISI tripped at 17:59 and 18:03 presumably from the SQZ rack work, HAM2 ISI tripped at 18:19 from the measurements being run on HAM2/3. Picket-fence plot died around 18:05 but was able to restart itself after 2 tries and ~5 minutes. Microseism is the highest its been in ~265 days, above the 90th percentile for the past ~12 hours.

Something happened at EndX at 19:29:21, the ISIs state1&2 tripped and so did the HEPI, not sure why, there was no one down there at the time and a DAQ restart was underway. All the sei signals went to zero, the SUS seems fine. After lots of checks and other restarts Erik went down to EX to physically powercycle some chassis, AA, IOP, Fil later joined him, the -18V DC Kepco power supply was found to have failed. FRS ticket 29752, alog74341

21:18 Started to relock

LOG:                                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
16:05 FAC Tyler, Chris, Eric Yarm/FCES N Tumbleweed clearing 16:55
16:12 SUS RyanC CR N ETMY OPLEV Charge measurement 17:21
16:14 FAC Ibrahim, Randy LVEA N Prep and start Craning 17:43
16:16 TCS TJ LVEA N TCS cabinets, parts search 16:29
16:21 VAC Janos EX, LVEA, Mids, EY N Filter bodies for turbo stations 19:23
16:21 EE Fil EX N SUS HWD checks 16:51
16:22 VAC Jordan, Gerardo LVEA/FCES N Add valves and gauges to FCT 19:47
16:25 VAC Travis MidX, EX N Turbopump checks 19:26
16:10 FAC Karen EX N Tech clean 16:38
16:38 FAC Karen EY N Tech clean 17:21
16:40 PSL RyanS, Jason PSL N Ref caf alignment 19:23
16:48 ALS TJ, Sheila, Dana, Daniel EX N Readjust laser 17:53
16:52 CDS Dave Remote N Camera work 17:37
16:54 EE Fil CER N HAM4 ISI coil driver checks 17:18
17:16 FAC Tyler 3IFO N Checks 17:33
17:18 EE Fil LVEA N Optical lever measurements 17:37
17:27 FAC Tyler Corner N Walkthrough with contractors 18:22
17:30 FAC Karen LVEA N Tech clean, out @ 17:45, back in at 18:05 19:19
17:46 LAS EX is LASER HAZARD EX Y EX is LASER HAZARD 19:29
17:51 SQZ Daniel SQZ racks N Cabling 18:58
17:53 TCS TJ, Camilla EX N HWS work 19:23
17:54 SEI Jim LVEA, HAM1 N Take off a piece of foam 17:58
17:56 FAC Randy, Ibrahim EY N Cleanroom vent prep 19:48
17:59 SEI Jim CR N HAM2/3 measurements 19:13
17:59 FAC Cindi FCES N Tech clean 18:56
18:04 EE Fil LVEA, SQZ racks N Join Daniel with cabling 18:58
18:08 CDS Jonathon MSR N Camera connections 19:08
18:10 EE Marc, Fernando EY N Check out cabling 19:17
18:23 FAC Tyler, Carolyn, Contractor MidY, EY N Walkthrough 19:42
18:36 FAC Chris +1 Site N Changing locks around site 20:03
18:56 FAC Cindi High bay N Tech clean 19:12
19:12 FAC Cindi OSB receiving N Cardboard 19:24
19:38 PSL RyanS CR N ISS 2nd loop 20:15
19:54 CDS Erik EX N Powercycle AA, IOP, ... chassis 20:58
19:54 SQZ Sheila LVEA N OMC cabling 19:54
20:02 OPS Camilla LVEA N Sweep 20:18
20:07 TCS TJ CER then Optics lab N Parts search, laptop dropoff 20:26
20:20 EE FIl EX N Join Erik, checks 20:58
21:11 EE Fil EX N Bring over a spare power supply 21:35
22:57 VAC Gerardo, Jordan, Mitchel LVEA, HAM6 N Checks 23:05
Images attached to this report
Comments related to this report
ryan.crouch@LIGO.ORG - 16:12, Tuesday 21 November 2023 (74349)PSL

I changed the H1:PSL-ISS_REFSIGNAL from -1.97 to -1.98 after we lost lock which brought the Diff power back to tolerance (between 2 and 2.5)