Reports until 11:31, Tuesday 21 November 2023
daniel.sigg@LIGO.ORG -
posted 11:31, Tuesday 21 November 2023 - (74332)
Fil Daniel
PMC install preparation:
- Extended the rack rails on top of SQZT0 to enable mounting the laser locking fiber beat note chassis.
- Installed the auxiliary signals concentrator 11 into the remote squeezer rack.
- Installed the long coax cables going from the remote squeezer racks to SQZT0.
Auxiliary Signals Concentrator 11 PD Monitors (D2300326) installed in SQZ-R2, slot U3.
Serial Number: S2300254