TITLE: 11/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 160Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Quiet day with some SQZ commissioning
18:21UTC Lockloss
18:51 Initial alignment started, finished at 19:16
20:10 NLN
20:25 Observing
20:39 into Commissioning
21:10 GRB-Short E454458 while SQZ comissioning was underway and LLO was still down
ITMY modes 5/6 was rising at a rate of 0.2% per hour (calculated from DTT measurements, 500 - 518 Hz BW=0.002), the broad monitor filter was showing it rising while the narrow was showing it decreasing which was confusing but the DTT measurements confirm its rising under its current settings.
23:00 I started a calibration measurement which finished at 23:30
23:35 back into Observing
23:56 SQZer unlocked and dropped us out of observing, back in at 23:59
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:31 | FAC | Karen | H2 enc | N | Tech clean | 16:32 |
| 19:09 | FAC | Cindi | Laundry room | N | Switch laundry | 19:24 |
| 18:54 | FAC | Firechief | Xarm | N | Drive down the arm | 19:20?? |
| 20:15 | FAC | Cindi | Laundry room | N | Get laundry | 20:30 |
| 22:53 | VAC | Travis | Optics lab | N | Parts check | 23:06 |