(Jordan V., Gerardo M.)
Yesterday, Jordan and I installed 3 o-ring valves on the filter cavity tube crosses, with this installation the crosses for section B of the filter cavity tube are complete, as far as hardware goes. Most of the equipment used during the installation was moved out of the LVEA and into the filter cavity enclosure, where we are going to start o-ring installation on section "C" next week.