TITLE: 11/28 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Relocked twice today, both locklosses (74432, 74438) being due to earthquakes. Had some issues with the first relocking, needing to go to GREEN_ARMS_MANUAL before running the initial alignment, and after still going through PRMI. Second relocking I also needed to touch both arms and we ended up going through CHECK_MICH_FRINGES on the way up. We are currently at LOWNOISE_COIL_DRIVERS. Other than that, everything was relatively normal.
We actually just got a verbals call out for an incoming earthquake from Fiji that is in the middle of the green zone on the EQ Response Zones script so hopefully we will be able to stay up!
LOG:
00:00UTC Detector holding in DOWN due to earthquake
00:40 Started Locking
- Needed to align ALSX manually, then on to an Initial Alignment
- 01:30 Initial Alignment completed, on to Locking
02:22 NOMINAL_LOW_NOISE
02:25 Observing
06:30 Earthquake mode activated
06:31 Lockloss due to earthquake
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
00:35 | Louis & Dana | LVEA | n | Tour | 01:05 |