TITLE: 11/30 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 140Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Struggled early in the shift to get DRMI to lock, but once successful, everything else ran smoothly.
H1 has now been locked and observing for 5 hours. If we lose lock, it may be challenging to relock with the elevated microseism.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 00:11 | PEM | Robert | LVEA, MER | - | Retrieve equipment, adjust fans | 00:15 |
| 00:15 | TCS | Corey | MER | - | TCS chillers | 01:15 |