Ops Day Summary

- Works at EY
    Apollo: ask Bubba
    Richard ask him

- Works at EX
    Keita (ISI) getting ready for SUS

- Works at LVEA
    Michael, Hugh: ... some HAM are offset by several mm and that can cause problems with the mode matching ... (talk to them)
    Arnaud TF


- Michael gave a tour to a PNNL group
- PRAXAIR came around 9:30AM, left around 11:40AM
- (14:20) John and a group of contractors went to the roof
- Mark Hankel and the fire department were checking fire extinguishers
- DUST at Bake-Out was very high (15000 for 300nm, 5000 for 500nm) today. Patrick told me that Greg was working inside. John is aware of the situation.