TITLE: 12/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
locking notes:
locloss @ Find_IR
locloss @ Find_IR
Went back to Initial Alignment while we were ringing down.
*H1:PEM-CS_DUST_PSL102 WARNING: dust counts did not change, please investigate this screenshot.
I think that the Dust monitor in the PSL may need to be looked at as it's reporting hasnt changed in 12 days even though we have had 40 MPH winds in the last 2 days.
Update on TCS Chiller water level:
Went out to the mechanical room and saw that the water level is where I had left it this morning.
I grabs a picture of the water
Although we are out of water in the refill jug. Im not sure if thats distilled water or just tap water, or special CO2 cooling water, with nano lemon flavored spark, so i'll just leave it until tomorrow.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:05 | TCS | Tony | Mechanical Rm | N | Y CO2 Chiller check, went @ 9am returned by 9:30 | 19:25 |
| 19:06 | TCS | Tony | LVEA | N | Checking for TCS Coolant leaks, Start 930 back at 10 | 19:36 |
| 19:07 | PEM | Robert | LVEA | N | Setting up shaker. | 20:07 |
| 20:10 | PEM | Robert | EX & EY | N | Looking for Stands | 20:58 |
| 23:56 | PEM | Robert | LEVA | N | Turning off lights | 00:16 |