TITLE: 12/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Currently observing for 2 hours. We've had two lock acquisitions for this shift from a fast lock loss and and earthquake that immediately followed it, then another earthquake later. The first acquistion I had some odd X arm transmission issues (see alog 74655) , but the second was automated.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:15 | PEM | Robert | LVEA | yes | Mounting accelerometers | 18:15 |
16:55 | FAC | Randy | VPW,high bay | n | Move equipment from VPW to high bay with forklift | 17:27 |
17:11 | FAC | Eric | EX | n | Mech room check | 17:47 |
18:11 | FAC | Eric | MX | n | Check on temperature dip | 18:53 |
18:47 | FAC | Eric | MX | n | Fixing heater element | 20:53 |
22:57 | VAC | Jordan, Mitchell | MX | n | Parts hunt | 23:29 |