Reports until 16:06, Thursday 07 December 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:06, Thursday 07 December 2023 (74663)
Ops Day Shift Summary

TITLE: 12/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Currently observing for 2 hours. We've had two lock acquisitions for this shift from a fast lock loss and and earthquake that immediately followed it, then another earthquake later. The first acquistion I had some odd X arm transmission issues (see alog 74655) , but the second was automated.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:15 PEM Robert LVEA yes Mounting accelerometers 18:15
16:55 FAC Randy VPW,high bay n Move equipment from VPW to high bay with forklift 17:27
17:11 FAC Eric EX n Mech room check 17:47
18:11 FAC Eric MX n Check on temperature dip 18:53
18:47 FAC Eric MX n Fixing heater element 20:53
22:57 VAC Jordan, Mitchell MX n Parts hunt 23:29