00:25 UTC H1:LSC-SRCL_TRIG_THRESH_ON was reduced from 0.24 to 0.20 to the completion of SRY Alignment, after struggling to touch up the SRM alignment by hand.
00:34 UTC Locking Process Started
1:17 UTC NOMINAL_LOW_NOISE reached, Violins dont look bad, just waiting on ADS CAMs.
1:26 UTC Observing reached.
03:32 UTC unknown lockloss See alog: https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=74795
Currently at MOVE_SPOTS
4:27 UTC Observing Reached!