TITLE: 12/14 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY:
IFO is in NLN and COMMISSIONING
17:56:40: Range Loss Investigation
(4 Screenshots)
20:45 UTC - Started running calibration measurements (1 screenshot)
20:50 UTC - Broadband calibration measurement started
21:18- UTC - Next calibration (simuLines) started.
21:19 - UTC - lost lock (alog 74814)
21:20 UTC - Relocking
21:27 UTC - Nds0 daqd restarted by Dave right after lockloss - caused all ndscopes to stall and require resetting.
22:37 UTC - Air handler red alarm started blaring. Eric was the last person in there earlier to check on these. I called him and he’s investigating. Trends show that it was off for about 15 minutes. Alarm is back to normal as of 14:50 UTC.
23:08 - Reached NLN - Resumed commissioning.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
22:11 | FAC | Eric | CS | N | Check air handlers | 22:21 |
19:45 | FAC | Kim | LVEA External Rollup Door | N | Cardboard Haul | 20:45 |
19:45 | FAC | Karen | Woodshop | N | Technical Cleaning | 19:55 |
18:38 | FAC | Karen | Vac Prep | N | Technical Cleaning | 19:38 |
17:41 | FAC | Cindi | Wood shop area | N | Laundry | 18:41 |
17:42 | Nutsinee | Optics Lab | Local | Testing | 18:38 | |
16:43 | FAC | Karen, Kim, Randy | Garb Storage | N | Assessing inventory | 16:43 |