Reports until 16:01, Thursday 14 December 2023
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:01, Thursday 14 December 2023 (74819)
OPS Day Shift Summary

TITLE: 12/14 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY:

IFO is in NLN and COMMISSIONING

 

17:56:40: Range Loss Investigation 

(4 Screenshots)

20:45 UTC - Started running calibration measurements (1 screenshot)

20:50 UTC - Broadband calibration measurement started

21:18- UTC - Next calibration (simuLines) started.

21:19 - UTC - lost lock (alog 74814)

21:20 UTC - Relocking

21:27 UTC - Nds0 daqd restarted by Dave right after lockloss - caused all ndscopes to stall and require resetting.

22:37 UTC - Air handler red alarm started blaring. Eric was the last person in there earlier to check on these. I called him and he’s investigating. Trends show that it was off for about 15 minutes. Alarm is back to normal as of 14:50 UTC.

23:08 - Reached NLN - Resumed commissioning.

 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
22:11 FAC Eric CS N Check air handlers 22:21
19:45 FAC Kim LVEA External Rollup Door N Cardboard Haul 20:45
19:45 FAC Karen Woodshop N Technical Cleaning 19:55
18:38 FAC Karen Vac Prep N Technical Cleaning 19:38
17:41 FAC Cindi Wood shop area N Laundry 18:41
17:42   Nutsinee Optics Lab Local Testing 18:38
16:43 FAC Karen, Kim, Randy Garb Storage N Assessing inventory 16:43
Images attached to this report