anthony.sanchez@LIGO.ORG - posted 16:18, Wednesday 27 December 2023 (75058)
Wednesday Ops Day Shift End


TITLE: 12/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Today's extremely high microseism has made it very difficult to lock all day due to a storm off of our western coast.
A few earthquakes are coming in making the problem worse.
I started another Initial alignment while an earthquake rolled through.

Everytime I get to MAX_POWER there is a lockloss.
So I have been trying to pause in Check_VIOLINS, so I can damp the ITMY before moving up to MAX_POWER.   

H1 has just gotten up to Check Violins before power up. I have decided to try a violin setting of FM6 + FM10 at gain of -0.1 on ITMY Mode 5
This setting was found in the VIOLINS google doc, but it has actually made the ITMY mode 5 worse for the short time that I was watching it.

ITMY is by far the single largest Violin mode.


LOG:
                                                                                                                                                                         

Start Time System Name Location Lazer_Haz Task Time End
16:13 VAC Janos, Gerardo , Roger Mech Mechanical N Vendor coming to work on Vac system 20:13
17:28 VAC Gerardo N2 Fill pipe N Chipping Ice off the overflow spout 20:25