anthony.sanchez@LIGO.ORG - posted 16:30, Thursday 28 December 2023 (75068)
Thursday Ops day Shift End

TITLE: 12/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
I've been Damping Violins for a while now at max power.

Called Dave to help with the Leap second issue.Dave was able to determine that it was an issue with DEB 10 machines not getting the new LEAP file (see Daves alog.) NUC 5 is now giving us the MicroSeism information we want but DMT viewer is still in error.

Dave had me power cycle the Thermostats in H2 again and we confirmed that the air flow is now better.

LOG:
I went to H2 to restart Thermostats
And did a sweep of LEXC, LSB & VPW Temps ( VPW Temps range from 66 to 72 infront of the sever exhausts.)

 