TITLE: 01/01 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Locked for most of the shift until the lockloss at 07:21UTC from a 7.4 from Japan, holding in down while the ground settles and probably will be for another hour.
I ran a cal measurement when I saw LLO was down and doing an Initial Alignment. Starting at 01:37UTUC finishing at 02:02UTC.