Displaying report 1-1 of 1.
Reports until 16:00, Tuesday 02 January 2024
LHO General (DetChar)
austin.jennings@LIGO.ORG - posted 16:00, Tuesday 02 January 2024 (75123)
Tuesday Operator Summary

TITLE: 01/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

- Light maintanence day, mainly VAC turbo/ion pump work and a HWS card swap from the CDS team

- Ran an initial alignment after ISC went through CHECK MICH FRINGES thrice - ran without issue

Note that there was a large tow truck on site towing a car from 22:16 - 22:25 UTC. Tagging DetChar in case this shows up on their end as noise.

- Lockloss @ 23:10 - cause unknown

- H1 is currently relocking at TRANSITION FROM ETMX

LOG:                                                                                                                                                                                                                         

Start Time System Name Location Lazer_Haz Task Time End
16:06 FAC Tyler LVEA/Mids N Check 3IFO items 16:47
16:06 FAC Ken EX N Lighting 19:54
16:24 VAC Janos/Travis MY/EY N Turbo test 19:30
16:24 FAC Karen EY N Tech clean 17:30
16:25 Kim EX EX N Tech clean 17:44
16:27 FAC Randy LVEA N Checks 16:45
16:35 FAC Chris LVEA N Pest control 18:03
17:26 CDS Erik MSR N Replace HWS sensor card 21:18
17:39 PEM Mitch EX/Y N DM FAMIS task 18:19
18:16 FAC Karen/Kim LVEA N Tech clean 19:41
18:18 CDS Tony/Randy EX/Y N Deploy end station laptops 19:20
18:24 VAC Janos LVEA N Ion pump work 20:07
18:59 EPO Oli + tour LVEA N Tour 19:48
19:09 SEI Jim CR N HAM 5 TFs 19:31
19:57 CDS Tony EY/EX N Set up workstations 21:05
20:14 ISC TJ LVEA N LVEA sweep 20:30
20:19 FAC Ken/Richard FCES N Checks 20:39
23:11 CDS Tony CER N Take pictures 23:13
Displaying report 1-1 of 1.