TITLE: 01/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
- 16:17 - GRB short E463149
- 16:51 - Superevent S240104b
- 17:11 - 18:10 - Fire pump testing began - Tagging DetChar in case this shows up as noise on their end
- EX saturation @ 22:02
- 22:35 - went into COMMISSIONING for opportunistic DARM measurements while LLO is down due to microseism
- ISC went through MICH FRINGES a few times without being able to move up, which is my cue to begin running an IA, which is currrently ongoing
- Mystery rise and steady hold of primary microseism is still apparent, coupled with a now rising secondary microseism, I have moved the SEI CONF guardian to USEISM to help make locking less cumbersome
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:50 | FAC | Johnson Controls | Site | N | Fire panel work | ?? |
17:03 | FAC | Karen | Wood shop | N | Tech clean | 17:20 |
18:26 | FAC | Kim | H2 | N | Tech clean | 18:30 |
19:33 | VAC | Janos | MX | N | Vac checks | 19:45 |
21:26 | FAC | Randy | EX Mech | N | Inventory | 21:56 |
22:34 | VAC | Gerardo | MX | N | Check purge air | ?? |
23:09 | CDS | Jonathan | EY | N | Finish set up of HWS computer | 23:59 |