As in 74872 and 74741, I have taken PEM_MAG_INJ and SUS_CHARGE from WAITING to DOWN so that they do not run tomorrow. Instead, tomorrow Louis and Sheila will try the risky DARM loop swaps and calibration from 7amPT. To re-enable the automated measurements, the nodes should be requested to INJECTIONS_COMPLETE before next Tuesday.
IFO was unlocked from wind this morning. Re-requested both guardians to INJECTIONS_COMPLETE.