Reports until 16:00, Monday 08 January 2024
LHO General
ryan.short@LIGO.ORG - posted 16:00, Monday 08 January 2024 (75253)
Ops Eve Shift Start

TITLE: 01/08 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 3mph Gusts, 2mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.51 μm/s
QUICK SUMMARY:

H1 is relocking following a M7.0 earthquake; currently up to MOVE_SPOTS. All systems look good; wind is low and microseism is sitting just below the 90th percentile.