Reports until 00:17, Friday 12 January 2024
LHO FMCS (ISC)
austin.jennings@LIGO.ORG - posted 00:17, Friday 12 January 2024 (75325)
Thursday Eve Shift Summary

TITLE: 01/12 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

- EX saturation @ 1:08

- Lockloss @ 5:53 - cause unknown

- Airhandler alert on alarm handler for MY REHEAT channel - looks like there has been a sharp spike over the past hour, Tagging FMCS

- Relocking was mostly straightforward, I did give ETMY a little tap during ALS to get it to catch but locking was otherwise automated

- Back to NLN @ 7:17/OBSERVE @ 7:24

- Following SDFs on ALS Y popped up, preventing me from going into observing, accepting for now for them to be looked at later, Tagging ISC

- Lockloss @ 7:49 - caused by 5.9 EQ from Alaska

- Called Ryan S. and let him know of the situation, ground motion is already starting to settle and he intends to untrip the WDs and begin an initial alignment soon after

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    

Start Time System Name Location Lazer_Haz Task Time End
23:51 PCAL Rick, Tony PCAL lab local Maintenance 01:23
00:19 VAC Janos MX N VAC checks 01:09
Images attached to this report