Reports until 14:07, Saturday 13 January 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 14:07, Saturday 13 January 2024 (75375)
Mid shift report

STATE of H1: Lock Acquisition
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 19mph Gusts, 16mph 5min avg
    Primary useism: 0.07 μm/s
    Secondary useism: 0.26 μm/s
QUICK SUMMARY:

After the Lockloss that tripped the I held us in down until Jim and I could figure out what is going on and how to stop it.
We ended up calling Danielle. Who helped us out by putting in a filter.
There was an ISI ITMX trip that occured while we were discussing the filter change. Jim asked me to go power cycle the Top ITMX ISI Interface chassis D1002432.

I got back to the control room and got a green light to start relocking. I started an initial alignment and then started to relock again.
we are currently in  Check Violins and moving up.