TITLE: 01/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Started relocking Since Jason is done touching up the Ref Cav and gave Oli the updates about the restart the FMC IOC procedure.
Oli is now logged in to fmcs-epics-cds and we went through a practise run to make sure we have the procedure correct.
Dave and I have decided that The last two OPs shifts can handle making sure the FMCS IOC is running manually, and he was going to make a CRON job that restarts it every hour for the OWL shift until Patrick get here in the morning.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:06 | PSL | Jason | Remote | N | Tuning the RefCav and ISS | 23:40 |