Ibrahim, TJ, Camilla, Naoki,
Looking at how the ZM4,5,6 alignment has shifted both with the vent and recent temperature changes in the LVEA.
Attached is ZM4/5 P/Y alignment since the last time we were SQZing to vented now, there is large changes of ZM5 (470urad in Pit and 230urad in Yaw). Alignment sliders haven't changed but SQZ ASC would have been changing some alignment when the IFO was locked.
ZM6 has large changes (1300urad in Pit and 280urad in Yaw). Currently DAMPED but alignment sliders are the same. Edit: DAMPED turns off the alignment sliders, once Austin brought back to ALIGNED it had moved <100urad.
We expect some changes from bouyancy of air. The HAM7 SUS are currently "aligned" with the doors being taken off HAM7. Jim hasn't locked the ISI yet. Looking at ZM4,5,6 alignment, last vent, IFO locked, and now.
Ibrahim is looking at temperatures and alignment since our last vent.
Vicky found that the SQZ beam was different on the RLF QPDs and not on the SQZT7 H1:SQZ-OPO_IR_PD_DC_POWER. Sheila checked that the OPOS doesn't seem to have changed much (<5um, 0.005urad if channels are calibrated), plot attached
Details of realignment and finding the beam in 75509.