Reports until 16:01, Monday 22 January 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:01, Monday 22 January 2024 (75510)
Ops Day Shift Summary

TITLE: 01/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC (covering for the latter half of the shift)
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM7 irises are in place, OMC work in HAM6 is ongoing.
LOG:                                                                                                     

Start Time System Name Location Lazer_Haz Task Time End
16:32 fac randy lvea n furniture moves & misc 19:29
16:35 fac karen.kim ham n cleaning around HAM7 18:21
16:36 vac jordan.VAC_crew HAM7 n HAM7 doors finishing 19:34
16:39 Site jason.ryanC WestBay n FARO surveying 19:58
16:48 ee fil east bay n cable search 17:28
16:52 LHaz LHO EX YES Laser HAZARD!! 17:57
16:59 isc camilla optics lab n prep for HAM7 17:45
17:25 Pcal tony EX n PCal closeout 18:07
17:40 CC mitch HAM6.7 n Distrib. Contam Control kit 17:41
17:49 sus rahul remote n HAM6 SUS meas 18:57
18:03 SLiC mitch EX n Prep for Baffles 18:44
18:51 sei jim HAM7 n Locking HAM7 19:02
18:59 omc koji HAM6 n Prep for OMC swap 19:56
19:08 isc camilla lvea y LVEA to laser HAZARD!!! 19:47
19:36 sus rahul HAM6 n prep for OMC swap 19:56
19:44 SUS austin remote n Moing ZM for HAM6 work 20:18
19:46 ISC ISC LVEA YES LVEA laser HAZARD!! 01:46
19:48 isc daniel HAM6 y laser for HAM6 alignment 20:23
20:20 SQZ Sheila.Julian.Naoki.Vicky HAM 7 YES SQZ work and HAM7/SQZT7 23:58
20:28 sus rahul remote n HAM6 sus TFs cont. 20:59
20:59 FAC Randy EY n Moving equipment to EY for wind fence 23:15
21:03 eng Betsy, Ibrahim LVEA y Vent help 21:39
21:15 CDS Fil EY n Checking on equipment 21:54
21:38 FAC Tyler Outbuildings n 3IFO inventory 23:58
21:42 IAS Jason, RyanC LVEA - W y FARO work ongoing
22:01 ISC Koji, Keita, Rahul LVEA - HAM6 YES OMC swap ongoing
22:02 ENG Betsy LVEA YES Vent help ongoing
22:20 LAZ Tony EX N Transition VEA to upgrade laser safe 23:18
22:53 VAC Janos, Travis MX n Hepta filter install and test 23:05
23:06 VAC Travis LVEA - Purge air 23:12
23:14 - Richard LVEA y Support 23:26
23:14 VAC Gerardo, Jordan EX n GV20 close and purge on ongoing
23:16 PEM Robert EX n Setup vibrometers ongoing
23:58 SQZ Naoki, Vicky LVEA - HAM6 YES Vent work ongoing