Late entry. Activities on Jan 22nd: - The HAM7 X+ and X- doors have been removed - The purge air was switched on at EX - GV20 (at EX) was closed - the GV struggled with closing, but in the end it seems to be OK - Electrically 1, mechanically both 2 spare roughing stations are finished - VPW C+B door issue - 2 screws stuck, tomorrow will open it: this load has some blanks and new Hepta headers, which will be also needed