Reports until 17:29, Tuesday 23 January 2024
LHO VE
janos.csizmazia@LIGO.ORG - posted 17:29, Tuesday 23 January 2024 - last comment - 16:10, Friday 26 January 2024(75526)
1-23 vent vacuum diary
Today's activities:
- The RGA tree at EX was leak-checked, and multiple flanges were leaky, possibly because of some overheating during a bakeout in the past. The gaskets will be redone, and the all-metal angle valve will be also replaced
- EX was vented
- The VPW vacuum chamber was opened, after the 2 stuck screw was removed
- Both 2 spare roughing stations are entirely finished
- All the Hepta header filter works were finished in the LVEA
Comments related to this report
gerardo.moreno@LIGO.ORG - 16:10, Friday 26 January 2024 (75591)VE

Measured the purge air dew point at the corner station with no usage from other groups, no people in chamber, measured -41.3 degrees C.

Measured the purge air dew point at EX, no open ports, before vent, measurement was done at the purge valve area, measured -45.4 degrees C.

Images attached to this comment