TITLE: 01/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: SQZ laser was turned back on and LVEA moved back to Laser Hazard, work continued at HAM6, wind fence repair was started, HAM3 was cleaned in preparation for opening.
LOG:
16:35UTC Team going into LVEA to check on the status of the TCS water leak
17:30 Squeezer laser okay to get turned back on; gets turned on
18:19 LVEA transition to LASER HAZARD
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
18:19 | site | site | LVEA | YES | LVEA is LASER HAZARD !! | Ongoing |
22:17 | OMC | Betsy | LVEA | yes | See if HAM6 peeps need help | Ongoing |
15:30 | FAC | Randy | LVEA NB | n | Craning | 18:14 |
15:30 | FAC | Karen | OpticsLab,VacPrep | n | Tech clean | 16:07 |
16:07 | FAC | Kim,Karen | LVEA | n | Tech clean HAM 6/7 | 17:36 |
16:35 | SYS | TJ,Betsy,Fil | LVEA | NO | TCS Water Leak Recovery Check | 16:54 |
16:51 | FAC | Ken | MechRoom | n | Replacing lights | 00:22 |
16:54 | VAC | Jordan | LVEA | n | Purge air measurement | 17:09 |
17:09 | VAC | Gerardo, Jordan | EX | n | RGA installation and swapping parts | 22:48 |
17:29 | EE | Fil,Camilla | LVEA | n | Turn on SQZ laser | 17:44 |
17:34 | FAC | Chris | LVEA | yes | Helping clean top of HAM3 | 18:43 |
17:36 | FAC | Kim,Karen | LVEA | yes | Tech clean HAM3 | 19:06 |
17:44 | FAC | Jim,Ryan S | LVEA | n | Helping move cleanroom | 17:58 |
17:50 | FAC | Eric | LVEA | n | Also helping move cleanroom | 18:07 |
18:10 | PEM | Robert | EX | n | Clean up for yesterday's work (didn't go yet) | 18:30 |
18:22 | SQZ | Camilla | LVEA | yes | Transitioning LVEA to laser hazard | 18:22 |
18:59 | FAC | Randy,Mitch,Jim | EY | n | Fixing wind fence | 23:16 |
19:07 | SUS | Ibrahim | LVEA | yes | Cleaning the outside of sus storage containers | 19:51 |
19:31 | OMC | Rahul, Koji | LVEA | yes | HAM6 work | 19:59 |
19:33 | PEM | Robert | EX | n | Clean up for yesterday's work | 23:33 |
19:34 | Camilla, Betsy | VacPrepLab | n | 19:51 | ||
19:35 | PCAL | Tony | PCal Lab | yes(local) | RespRat(responsivity ratio measurement) | 20:59 |
20:57 | EE | Fil | EY | n | Measuring cables | 23:52 |
21:01 | TCS | TJ | LVEA | yes | Looking for plumbing | 21:31 |
21:03 | Health | Camilla | MY | n | Getting healthier | 21:32 |
21:15 | SUS | Ibrahim | LVEA | yes | Cleaning the outside of storage containers pt2 | 22:05 |
21:41 | Tour | Sheila, Alan, interns | LVEA | yes | Tour of LVEA | 22:36 |
21:41 | CDS | Erik | EY | n | Replace failed power supply | 22:08 |
22:16 | Camilla | OpticsLab | n | Looking for stuff | 23:31 | |
22:23 | FAC | Tyler | EX | n | Meet with Jordan | 23:07 |
22:48 | VAC | Jordan, Janos | LVEA | yes | Looking for parts | 23:08 |
22:53 | Jason | LVEA | yes | Check Faro | 00:13 | |
23:45 | Ibrahim | LVEA | yes | HAM6 express delivery | 00:10 |