Reports until 16:09, Friday 26 January 2024
LHO General
corey.gray@LIGO.ORG - posted 16:09, Friday 26 January 2024 (75580)
Fri (Afternoon) Ops DAY Shift Summary

TITLE: 01/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Afternoon shift's main item of note  is the CRASH of the OAF front end as well as the SEIH16 model; recovery of this would be made after the shift (after CER accelerometer work).

OMC aligning (from the Control Room) has also been ongoing through the afternoon by Keita/Koji/Rahul.
LOG: