TITLE: 01/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Afternoon shift's main item of note is the CRASH of the OAF front end as well as the SEIH16 model; recovery of this would be made after the shift (after CER accelerometer work).
OMC aligning (from the Control Room) has also been ongoing through the afternoon by Keita/Koji/Rahul.
LOG:
- 2102 Tagging in for Oli's shift (corey)
- 2113-2151 MY part search (gerardo)
- 2123-2144 Hartman table checks (camilla)
- 2153 HAM3 baffle bolt assy prep in HAM3 cleanroom (mitch, tony)
- 2145-0000 Accelerometer work in CER (marc, jabari)
- 2207-2252 HAM3 vent prep (jordan, janos)
- 2223 OAF model crash (On CDS Overview, we have Front End & ADC faults/red, but also have issues with HAM SEI1/6 model [which is a surprise]). Suspect this is due to the Accelerometer work in the CER. Plan is to let Marc finish his work before starting front end recovery work.
- 2249 External Alert tests (tj)
- 2306-2329 Locking HAM3 HEPI (jim)
- 2307-2347 EX pump down prep (jordan)
- 2318 Grabbing ladder at EY (ken)