Displaying report 1-1 of 1.
Reports until 13:38, Monday 29 January 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 13:38, Monday 29 January 2024 (75604)
Ops Mid Shift report

TITLE: 01/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 6mph Gusts, 4mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.47 μm/s
QUICK SUMMARY:
Multiple Teams went into the LVEA to get work done on or near HAMs 3 , 6 and 7.
A team wne to EY to work on wind fence repairs.
HAM3 Updates: The door bolts have had their bolts broken loose.
Most teams are out for lunch.
Hanford Site sounded alrams to test their emergency systems at 1 pm.
OMC Work for HAM6 is continuing.

 

 

Displaying report 1-1 of 1.