TITLE: 01/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LVEA is Still in LASER HAZARD
22:31 GBR-Short E466649
22:46 McCarthy called the control room to inform us of a potato truck accident on 240.
The update for HAM3 is the Door is now held on by 3 bolts.
OMC Team seems like they are still Centering beam spots and still needs to set up the virtual view ports.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:35 | site | site | LVEA | YES | LVEA is LASER HAZARD !! | 16:02 |
16:12 | FAC | Kim & Karen | LVEA | Yes | Technical cleaning. | 17:12 |
16:15 | FAC | Travis & Mitchel | LVEA | yes | Looking at conflats. | 17:15 |
16:53 | VAC | Jordan | LVEA | yes | Breakin Door bolts off HAM3. | 18:29 |
17:14 | FAC | Karen | EY | No | Technical Cleaning | 19:37 |
17:15 | OMC | Camilla , Sheila | HAM6,7 | Yes | OMC work | 20:59 |
17:59 | ENG | Betsy | LVEA | Yes | Checking Status of LVEA, and moving parts around. | 19:07 |
18:28 | FAC | Tyler | Mid X & EX | No | End X surveying | 20:28 |
18:55 | FAC | Kim | LVEA | Yes | Technical Cleaning | 20:55 |
19:22 | OMC | Rahul | LVEA HAM6 Area | yes | grabbing head set. | 19:27 |
19:24 | OPS | Ryan C | West Bay | Yes | Power off Surveying Equipment & power cycling HAM3 DustMon | 19:48 |
21:34 | FAC | Mitchel | LVEA HAM3 | Yes | Baffling HAM3 Prepwork | 23:32 |
21:45 | OMC | Keita & Rahul & Julian | LVEA HAM6 | yes | centering beam spots | 01:45 |
21:56 | Baffles | Corey | LVEA HAM3 | Yes | Baffling HAM3 Prepwork | 23:32 |
22:07 | OMC | Sheila & Julian | HAM6 | yes | OMC Beam spot centering | 23:47 |
22:53 | VAC | Jordan & Travis | LVEA | yes | Mounting cable trays | 23:28 |