Reports until 16:56, Monday 29 January 2024
LHO VE
janos.csizmazia@LIGO.ORG - posted 16:56, Monday 29 January 2024 - last comment - 21:05, Monday 29 January 2024(75609)
1-29 vent vacuum diary
Today's activities:
- All bolts (but 4 of them) on HAM3 Y+ door have been broken, in preparation for the door removal - most likely tomorrow, during laser safe conditions
- The cable trays on BSC8 have been removed, as they would be on the way for the 12" and 16.5" conflat feedthru removals - this activity will start after the LVEA will be laser safe
- The troubleshooting of the EX RGA ion pump has been done - see here in detail: https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=75605
- The corner purge air was measured, and found satisfactory (~-46 deg C); seed details in comment
Comments related to this report
jordan.vanosky@LIGO.ORG - 21:05, Monday 29 January 2024 (75610)

Purge air dew point measured at the OMC tube, -46degC, prior to today's in chamber activites.