Reports until 16:01, Tuesday 30 January 2024
LHO General
austin.jennings@LIGO.ORG - posted 16:01, Tuesday 30 January 2024 (75624)
Tuesday Operator Summary

TITLE: 01/30 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Took over for Tony @ 1145 to allow him to work with the HAM 3 baffle installation team.

Currently FARO work and tour ongoing in the LVEA.

Travis and Janos at EX running pump checks.

LVEA is currently laser safe.
LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                           

Start Time System Name Location Lazer_Haz Task Time End
16:04 FAC Chris S LVEA FCES No Replacing Eye wash stations 19:17
16:12 FAC Kim LVEA No Technical Cleaning 17:58
16:13 FAC Karen LVEA No Technical cleaning 17:13
16:13 VAC Jordan LVEA No VAC work 16:22
17:11 VAC Jordan & Travis LVEA No HAM3 Door work 20:34
17:13 OMC Sheila & Preet LVEA HAM6 no Gate valve and curtain near HAM6 & 7 19:38
17:14 VAC Betsy LVEA yes LVEA walk around checking status. 19:03
17:14 FAC Karen Mid Y No Technical cleaning 19:24
17:22 SQZ Camilla LVEA HAM 6& 7 YES Helping with OMC and SQZ work 17:38
17:29 Beckhoff Daniel CRTL RM N Restarting Beckhoff. 19:22
18:17 EE Fil End X No Working on a scroll pump for the Vac team 20:13
18:29 FAC Kim End X No Technical Cleaning 20:03
18:59 FAC Tyler FCES No Check safety & fire suppresion equipment? 19:24
19:03 VAC Betsy LVEA HAM6 no Checking on HAM6 status 19:24
19:18 VAC Jordan & Tyler LVEA HAM3 NO Taking the HAM3 Door off 20:35
19:22 Surveying Jason & Ryan C LVEA No Surveying the LVEA floor. 20:21
19:27 VAC Betsy LVEA HAM3 No Hovering 20:55
19:38 ISC TJ HAM 3 N Lock ISI 20:53
19:39 SUS Rahul HAM 6 N Measurements 20:48
20:30 ISC Tony HAM 3 N Join HAM crew 20:53
20:54 ISC Robert/Mitch/Corey/Tony/TJ HAM 3 N Baffle installation 23:54
21:01 VAC Jordan LVEA N Purge air inspection 21:22
21:24 EE Marc/Jabari MY N Install accelerometers 23:15
21:39 FARO Jason/Ryan C W Bay N FARO work ??
22:08 SUS Rahul CR N TF measurements 22:38
22:39 OPS Betsy HAM 3 N Check on team 22:52
22:47 ISC Julian Optics lab N Parts testing 0:02
22:57 VAC Travis/Janos EX N Pump checks ??
23:39 EPO Mike + 2 LVEA N Tour ??