TITLE: 01/31 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: USEISM
Wind: 3mph Gusts, 1mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.62 μm/s
QUICK SUMMARY:
- HAM 3 baffle work continues
- TCS work will continue today
- HAM 7 work slated for sometime this week or the beginning of next