TITLE: 01/31 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM 3 baffle work continues. HAM 7 work slated for tomorrow. Team TCS is still currently in the LVEA.
LVEA is laser safe.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:00 | fac | karen.kim | lvea | n | technical cleaning (Karen out @ 17:18) | 17:50 |
16:33 | VAC | Jordan | LVEA | N | Purge air measurement | 16:42 |
16:35 | TCS | Camilla/TJ | LVEA | N | TCS table work and leak checks (Jason in @ 17:51) | 18:34 |
16:42 | ISC | Robert/Mitch/Tony/Corey | HAM 3 | N | Baffle installation | 19:18 |
16:52 | VAC | Jordan | EX | N | Pump down (Travis in @ 17:37) | ?? |
17:32 | EPO | Preet/Vicky | HAM 3 | N | HAM 3 views | 18:05 |
17:54 | SUS | Keita/Rahul/Betsy | HAM 6 | N | OMC work | 19:59 |
18:14 | FAC | Chris | EY | N | Wind fence prep work | ?? |
18:52 | TCS | TJ/Camilla/Jason | LVEA | N | TCS water line leak checks and table work | 20:03 |
19:03 | VAC | Travis | LVEA | N | Conflats work | 19:43 |
19:24 | FAC | Karen | Wood shop/fire pump | N | Tech clean | ?? |
20:59 | ISC | Mitch/Robert/Tony/Corey | HAM 3 | N | Baffle installment (Tony/Corey out @ 23:27) | 23:40 |
21:08 | VAC | Jordan | EX | N | Pump down | 23:29 |
21:14 | VAC | Travis | LVEA | N | Feedthru and conflats work | ?? |
21:25 | TCS | Camilla/TJ/Jason | LVEA | N | TCS work (Camilla out @ 23:44) | ?? |
21:47 | EE | Marc/Jabari | EX/MX/EY/MY | N | Install accelerometers | 23:38 |