H1 General
anthony.sanchez@LIGO.ORG - posted 08:13, Thursday 01 February 2024 (75661)
Thursday Ops Day Shift Start

TITLE: 02/01 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 7mph Gusts, 4mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 1.07 μm/s
QUICK SUMMARY:
CDS OVERVIEW looks green.
HAM6 HEPI and ISI are currently tripped.

Expected Work:
Robert is expected to head back into HAM3 to Damp Baffles, take pics, and fix any problems.
VAC team is expecting to leak check the ENDX and start working on Feed Throughs on BSC8.



 

 