Reports until 16:00, Friday 02 February 2024
LHO General
austin.jennings@LIGO.ORG - posted 16:00, Friday 02 February 2024 (75690)
Friday Operator Summary

TITLE: 02/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

- HAM 3 door is back on and chamber is closed out

- SUS/SQZ crew continue to hash out the PSAMS adjustments, which will continue into next week.

- VAC conflat work ongoing, EX continues pump down

- DM 10 has been going off intermittently throughout the day

LVEA is Laser SAFE.
LOG:                                                                   

Start Time System Name Location Lazer_Haz Task Time End
00:21 LASER SITE LVEA YES LVEA IS LASER HAZARD 15:58
16:18 FAC Karen/Kim LVEA N Tech clean 17:19
16:34 SUS Rahul Remote N Closeout TFs HAM 3 (PR2/MC2) 17:40
16:34 VAC Jordan LVEA N Pure air measurement 16:43
17:11 FAC Tyler HAM 3 N Prep for door crew 17:22
17:40 EE Marc HAM 3 N Ground loop checks 18:16
17:41 FARO Jason LVEA N FARO checks 18:06
17:43 FAC Tyler/Travis/Betsy/Jordan/Gerardo HAM 3 N Door installation 20:04
17:51 FAC Karen H2 N Tech clean 18:12
17:52 ISC Robert HAM 3 N Baffle install 18:45
18:29 SUS Rahul/Camille HAM 7 N ZM5 PSAMS adjustment 19:51
19:11 PCAL Tony/Dripta PCAL Lab Y (LOCAL) Measurements 21:14
19:15 SQZ Camilla/Vicky/Naoki SQZ tables N Parts search 19:24
20:52 FAC Chris EY N Wind fence work 21:14
20:58 VAC Travis/Janos LVEA N Conflats work ??
21:18 ISC Keita HAM 6 N Electronics check 22:21
21:19 VAC Jordan/Gerardo Y beam manifold N Gate valve 23:35
21:19 EE Marc FCES N Install accelerometers 22:21
21:40 PCAL Tony/Dripta PCAL Lab Y (LOCAL) Measurements 22:22
21:57 FAC Mitch HAM 3 N Bag and tag parts 22:15
22:20 TCS Jason/Camilla/TJ/Oli Mech room/LVEA N Turn on chillers 23:54
23:07 OPS Betsy LVEA N Walkaround 23:30