Camille (CIT), Rahul
Just like ZM4 (see LHO alog 75677) we have offloaded ZM5 (P-SAMs) in HAM7 chamber to 47 in lbs. as per E2300463_V1. We followed the same procedure as described in alog 75677. Camille will post all the relevant pictures.
Post work transfer function measurements showed that the suspension is healthy.
Next we will work with Sheila et al on beam alignment in HAM7 chamber and mechanically offload the alignment sliders for both the suspension.