cheryl.vorvick@LIGO.ORG - posted 22:45, Wednesday 28 August 2013 (7572)
TMSX upper structure prep - ISC table optics cleaned with TOP GUN
- Jeff, Corey, Andres, Cheryl

Upper Structure:
- OSEM cables dressed on the upper mass
- cables that go through the upper mass are loosely bundled and tied to the ISI
- dog clamps that were adjusted yesterday were torqued to spec.
- telescope safety support beams were attached to the upper structure cube

TO DO:
- look at CB-3 cable bracket placement in D1300007-v2.  I put in a separate alog.
- redress upper mass cables after hanging the telescope.  The upper mass is sitting high, so cables attached to it need to be adjusted after it's back in position.  I worked on the cables coming through the upper mass in an attempt to have them not touch the upper mass and not rub against each other.  Many attempts failed and Jeff's idea to tie them together is our only option for having them not touch the upper mass.


ISC Table / Telescope:
- Corey cleaned all the ISC table optics with Top Gun
- he and I looked at a couple optics early in the day, and we both saw that the large particulate does come off pretty well, and the smaller particulate doesn't really budge - a familiar scene
- threaded rods that hold the protective cover for the ISC optics are in C&B overnight - they are a good 4" longer than necessary, and the extra threaded rod gets scraped as the protective cover is installed and removed, so I asked to have the extra length removed and the parts recleaned class-B


TO DO:
- revisit the telescope optics with Top Gun to remove any particulate that might have fallen from the ISC table