TITLE: 02/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Main activities today were HAM7 beam alignment work with more to come tomorrow, the TCS water lines were filled and chillers are running again; LVEA is still laser hazard.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:20 | FAC | Kim, Karen | LVEA | - | Technical cleaning | 17:48 |
16:32 | TCS | TJ, RyanC, Jason | LVEA/MER | - | Start checks on TCS water lines | 17:29 |
16:33 | SQZ | Sheila | LVEA | - | Looking for equipment on ISCT1 | 17:17 |
16:33 | FAC | Eric | EX | - | Checking roll-up door | 17:01 |
16:43 | VAC | Jordan | LVEA | - | Purge air measurement at output arm | 16:51 |
17:02 | VAC | Janos | LVEA | - | Checking pumps | 17:09 |
17:12 | SEI | Jim, Tony, Neil, Michael, Shoshana | EX | - | Checking BRS | 19:38 |
17:13 | FAC | Randy, Ibrahim | LVEA | - | Craning in W-bay | 18:19 |
17:13 | CDS | Fil | LVEA | - | HAM6 ground loop checks (OMs to SAFE) | 18:03 |
17:26 | CDS | Erik | EY | - | Check on HWS computer | 17:50 |
17:28 | SAF | Sheila, Camille, Julian, Rahul | LVEA | YES | Transitioning to HAZARD | 17:44 |
17:43 | IAS | Jason, RyanC | LVEA | YES | FARO surveying in W-bay | 20:02 |
17:44 | SAF | LVEA is Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 17:44 |
17:45 | SQZ | Sheila, Rahul, Camille, Julian, Naoki | LVEA | YES | Beam alignment in HAM7 | 20:38 |
18:06 | AOS | Betsy | LVEA | YES | Helping HAM7 team | 18:36 |
18:23 | FAC | Karen | EY | - | Technical cleaning | 19:40 |
18:41 | FAC | Randy, Ibrahim | LVEA | YES | Craning in W-bay | 19:53 |
18:48 | FAC | Tyler | FCES | - | Inventory | 19:02 |
18:51 | FAC | Chris | LVEA | YES | FAMIS checks | 19:13 |
19:31 | VAC | Travis, Jordan | FCES | - | Check RGA equipment | 19:52 |
20:31 | CDS | Fil | EX | - | Cabling for BRS and OpLev | 00:30 |
21:08 | TCS | TJ, Jason | LVEA | YES | Plugging in chiller lines | 22:48 |
21:17 | VAC | Gerardo | LVEA | YES | Leak detector on Y manifold | 22:19 |
21:21 | VAC | Jordan | EX | - | Leak checks | 00:20 |
21:31 | VAC | Travis | LVEA | YES | BSC8 flanges | 22:35 |
21:41 | SQZ | Sheila, Rahul, Naoki, Julian, Camille | LVEA | YES | HAM7 beam alignment work | 23:44 |
22:19 | VAC | Gerardo | EX | - | Retreiving equipment | 23:03 |
22:23 | SEI | Jim, Tony, Michael | Overpass | - | Tour and vault searching | 23:22 |
22:51 | AOS | Jenne, Neil, Shoshana, Wasim | LVEA | YES | Tour for visitors | 23:51 |
23:29 | VAC | Janos | LVEA | YES | Checking on a pump | 00:29 |
23:58 | VAC | Gerardo | LVEA | YES | Leak checking near +Y manifold | 00:58 |